our work
explore our past projects
We have served and satisfied many prestigious clients within the energy sector.
Brex
Year
Oct 2024-On Going
Client
ALUMINIUM COMPANY OF MALAYSIA BERHAD
Works
EPCC for Gas and Utilities Piping System
Shell Rosmari Marjoram Field Development Project
Year
Jun 2024-On Going
Client
Samsung E&A
Works
Mechanical and piping work, Flange Serration, Bolt Tensionning Work
Basil
Year
May 2024-On Going
Client
HQC
Works
Piping Mechanical Engineering and Electrical and Instruments
SARAWAK METHANOL PROJECT
Year
Sept 2023-On Going
Client
Samsung E&A
Works
Mechanical and piping works, commissionning jit boiler
GES KLANG TERMINAL-BOTTLING PLANT
Year
Mar 2022-On Going
Client
GES – Global Energy Storage
Works
Maintenance services for bottling plant
EURO IV
Year
Aug 2020-Ongoing
Client
HQC
Works
TFA management team & hydraulic-controlled flange management & flange surface machining
SHUTDOWN MAINTENANCE
Year
Sep 2019-Nov 2019
Client
PEC
Works
Hydraulic-controlled torque flange management
Samur
Year
June 2019-Aug 2019
Client
PIONEER HEAT TREATMENT
Works
Hydraulic-controlled belt tensioning. Hydraulic-controlled bolt torque, and flange management for warranty shutdown
ARKEMA K2
Year
Apr 2019-Nov 2019
Client
TECHNIP FMC
Works
Total 100 pax of welders, fitters, foreman, and supervisor supply for jacketed pipe site installation and hydrotest
P-14 Utilities & Interconnecting
Year
May 2018-Dec 2019
Client
PIONEER HEAT TREATMENT
Works
P-14 Utilities & Interconnecting
Year
May 2018-Sep 2018
Client
PIONEER HEAT TREATMENT
Works
Hydraulic-controlled bolt tensioning and hydraulic-controlled bolt torque tightening
SAPA-WI
Year
Apr 2017-July 2017
Client
BMech Engineering Sdn Bhd
Works
SAPA WATER INJECTION platform and steel structure fabrication
Tank 7
Year
Apr 2016-Nov 2016
Client
BMech Engineering Sdn Bhd
Works
15,000 dia inch of stainless steel pipe shop fabrication, site installation, flange management and N2 pneumatic test.
MLNGTrain9
Year
May 2015-July 2015
Client
DIALOG
Works
Hydraulic-controlled bolt tensioning for critical flare line
MLNGTrain9
Year
Apr 2015-Aug 2015
Client
PEC
Works
Hydraulic-controlled bolt tensioning and hydraulic-controlled bolt torque tightening
SAMUR
Year
Mar 2016-May 2017
Client
PIONEER HEAT TREATMENT
Works
Hydraulic-controlled bolt tensioning & hydraulic-controlled bolt torque tightening during construction installation
MLNGTrain9
Year
Feb 2015-Sep 2015
Client
PROMECH
Works
7,000 DIA inch piping site installation, hydro test, hydraulic-controlled bolt tensioning & hydraulic-controlled bolt torque tightening
recent work